Menu

AROONA enables implementation of new ERP system

Ermitage cheese dairy, France

AROONA enables implementation of new ERP system | Fromagerie Ermitage
The issue

The Ermitage cheese dairy is based in Pays de Clerval. Its plant in Clerval-Ermitage has an OM1 multimode fiber infrastructure (62.5/125) with a maximum throughput of 100 Mbps. This limitation prevented the rollout of a new ERP system with a minimum throughput requirement of 1 Gbps. A standard rip-and-replace upgrade was not feasible because the existing cable trenches could no longer be accessed.

The AROONA solution

Ermitage decided to install a compact AROONA-STAR module to increase the throughput of one of its 300 m multimode links from 100 Mbps to 1 Gbps. This passive solution was identified as an alternative to major upgrade works since the optical fiber could not be replaced.

The benefits of the solution
  • Cost effective: no expensive optical fiber replacement
  • No constraints: service interruption limited to 1 hour

Our other case studies Fiber Optic Networks:

Cerema Et Ibm
Fiber Optic Networks An ecological LAN in public establishments with AROONA More info
AROONA facilitates innovative digital solutions for universities
Fiber Optic Networks AROONA facilitates innovative digital solutions for universities More info
Urban Community Of Alençon, France
Fiber Optic Networks AROONA serves communities’ networks More info
Nokia bell labs
Fiber Optic Networks The PROTEUS solution and its space division multiplexing technology helping telecom research More info
Kddi JAPAN
Fiber Optic Networks PROTEUS solution helps achieve world record 10 Pb/s throughput in a single optical fiber More info