Menu

AROONA enables implementation of new ERP system

Ermitage cheese dairy, France

AROONA enables implementation of new ERP system | Fromagerie Ermitage
The issue

The Ermitage cheese dairy is based in Pays de Clerval. Its plant in Clerval-Ermitage has an OM1 multimode fiber infrastructure (62.5/125) with a maximum throughput of 100 Mbps. This limitation prevented the rollout of a new ERP system with a minimum throughput requirement of 1 Gbps. A standard rip-and-replace upgrade was not feasible because the existing cable trenches could no longer be accessed.

The AROONA solution

Ermitage decided to install a compact AROONA-STAR module to increase the throughput of one of its 300 m multimode links from 100 Mbps to 1 Gbps. This passive solution was identified as an alternative to major upgrade works since the optical fiber could not be replaced.

The benefits of the solution
  • Cost effective: no expensive optical fiber replacement
  • No constraints: service interruption limited to 1 hour

Our other case studies Fiber Optic Networks:

Nokia bell labs
Fiber Optic Networks The PROTEUS solution and its space division multiplexing technology helping telecom research More info
Kddi JAPAN
Fiber Optic Networks PROTEUS solution helps achieve world record 10 Pb/s throughput in a single optical fiber More info
Military Base 1150x500
Fiber Optic Networks AROONA is contributing to the latest digital transition of the armed forces More info
AROONA breathes new life into obsolete fiber-optic cables
Fiber Optic Networks AROONA breathes new life into obsolete fiber-optic cables More info
2 Alpes Ski Resort
Fiber Optic Networks AROONA serves digitization of ski resorts More info